FPrimeC Solutions - Transmission Line Foundation

Non-destructive Evaluation of Transmission Line Foundation

The Problem FPrimeC was retained by customer to perform non-destructive evaluation and testing on existing transmission line foundations in Fort MacKay, Alberta. The main objective was to identify the unknown length of existing pile foundations, as well as verifying the integrity of these foundations.   Multi-Technology Approach for Testing Foundations A multi-technology approach was used Read more about Non-destructive Evaluation of Transmission Line Foundation[…]

Case Study #3 - NDT of Concrete Walls

Nondestructive Evaluation of Concrete Walls

Nondestructive Evaluation of Concrete Wall at Coleman Mine |  Levack, Ontario | May 2018 FPrimeC Solutions was engaged by Komri Engineering and Quatro Industries Ltd to conduct nondestructive evaluation of concrete walls supporting the hoist (for transportation to the mine) and other mechanical equipment at Coleman Mine near Levack, Ontario. The Problem Cracking was observed on exterior Read more about Nondestructive Evaluation of Concrete Walls[…]

Case Study #4 - NDT of Parking Garage

Nondestructive Evaluation of Parking Garage

Nondestructive Evaluation of Parking Garage in Residential Condominium  Thornhill, Ontario | Mar 2018 FPrimeC Solutions was engaged by condominium owner to conduct non-destructive testing on the 46,000 sq ft. concrete slab (2 level parking structure). The Problem The main objective of this investigation was to evaluate the condition of concrete slab underneath mastic, identify potential Read more about Nondestructive Evaluation of Parking Garage[…]